Split Sleeve: Assembly Instructions

January 30, 2004

Determine cable violation in fire-wall (how many violations), angle of entry, or exit of the cables. Inspect violation to determine the proper Split Sleeve System size (1", 2", 4" inside diameters). Up to 48% of the aggregate cross-sectional area of the Sleeve may be filled with cables in walls and floors rated up to 2 hours, 34% cable load for 4 hour ratings. See the Load Chart and Installation Pictorial.

"Clean-up" the fire-wall penetration (both sides of wall) ensuring not to nick the cable jacket(s). (Use a slotted coupling to mark Sleeves hole size). Work the bottom half of the Split Sleeve under the cables as you insert it into the wall penetration. Support the cable(s) as the upper half of split sleeve is inserted through the fire wall. Install top half, maintaining sleeve polarity. Look for machine or paint marks on end of the Split Sleeve halves to insure the halves are installed as machined.

Work cables through the slot of the 1st washer, work the washer over the sleeve halves and against the wall. (If your hole is not the size of the sleeve, apply a 3/8 bead of firestop caulk behind the first washer on each side of the wall.) Install the 2nd square washer for the first side and invert the slot so the slots in the washers are 180 degrees from each other. Work the cables through the slot in the first coupling and begin to screw it down the sleeve until equal lengths protrude on both sides wall. Install the split bushing if there is a chance that more cables will be pulled in the future.

Repeat the above procedure for the other side of the Sleeve system. Tighten the slotted couplings only enough to seat the square washers. Do not over or under tighten the slotted couplings.

Be sure to fill out and adhere the Documentation Label as close as possible to the Sleeve System. Also, if you are installing several of these Sleeves, be sure to alfa-numerically I. D. the walls. Use an indelible marker. Take a picture of your installed Sleeve System; you may need it in the future. Always refer to the UL document pertaining to your application for details and limitations!

 

 

 

icon1 icon2 icon3

themed image

Secondary Header:

First Heading or Title

Septermber 16, 1926

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software